Fall and winter are a common time to finish basements, and a bathroom is often part of the plan. The rough-in is the plumbing that goes in before walls and flooring: drain lines, vents, and water supply. Getting it right below grade takes more planning than a bathroom upstairs.
The first question: where is the sewer line?
If the main sewer leaves the house below the basement floor, the toilet, shower and sink can drain by gravity. The plumber cuts trenches in the slab, sets the drain pipes at the correct slope, and ties into the existing building drain. If the sewer exits above the floor, the fixtures need a sewage ejector pit, a sealed basin with a pump that lifts waste up to the main line.
What a rough-in covers
- Toilet flange location, typically 12 inches from the finished wall to the flange center
- Shower or tub drain with a trap below the slab
- Sink drain and vent through the wall
- Vent connections tied into the existing stack or run through the roof
- Hot and cold supply lines stubbed out for each fixture
Things to settle early
Most jurisdictions require a permit and an inspection before the trenches are filled and walls closed. A bathroom below street level is also a good place for a backwater valve. Decide on fixture locations before the plumber arrives, since moving a drain after the concrete is patched means cutting the floor again.
Brightpipe Plumbing books rough-in work with plumbers serving Ruby, SC.